Concentrator Milling Area Performance Based Maintenance
YEM has been awarded a 1+1 year maintenance contract to provide performance based maintenance services to the whole milling area…

YEM has been awarded a 1+1 year maintenance contract to provide performance based maintenance services to the whole milling area…
This was a project to strengthen the Pebble Crusher foundations. Line 3 completed over a 3-week period. Line 4 was…
The 470 meter long trailing cable on the Reclaimer was damaged and required replacing during a planned shutdown. The cable…
Install cable ladder and 1800 meters of 185mm2 cable from SUB29101 to power cabinets via high level cable rack Install…
This project is to install new cable ladder along 2.2 kilometres of overland conveyor.This is to facilitate the removal of…
Working directly with the client, carrying out maintenance on High Voltage equipment within the Power Station. Carrying out maintenance on…
Electrical Maintenance on the whole concentrator. Working directly with the client on all fronts, from the main crushers through to…
The scope includes design, engineering, fabrication, installation and commissioning of 6 sets of steam extracting systems. The project is to…
These 7.8MW TECO motors require upgrading from OEM vendor. YEM was responsible to provide service of changing out the old…
Different maintenance projects on the world’s largest ball mills on Sino iron site. Works including thrust bearing inspection and change…
Various projects have been conducted to rectify alignment issues to achieve better operational conditions, including pinion change out and alignment,…
EPC project for upgrading existing major hoppers with a new type of lining system. YEM was responsible for the engineering,…