This was a project to strengthen the Pebble Crusher foundations. Line 3 completed over a 3-week period. Line 4 was…
Working directly with the client, carrying out maintenance on High Voltage equipment within the Power Station. Carrying out maintenance on…
This project is to install new cable ladder along 2.2 kilometres of overland conveyor.This is to facilitate the removal of…
YEM has been awarded a 1+1 year maintenance contract to provide performance based maintenance services to the whole milling area…
Electrical Maintenance on the whole concentrator. Working directly with the client on all fronts, from the main crushers through to…
Install cable ladder and 1800 meters of 185mm2 cable from SUB29101 to power cabinets via high level cable rack Install…
The 470 meter long trailing cable on the Reclaimer was damaged and required replacing during a planned shutdown. The cable…
These 7.8MW TECO motors require upgrading from OEM vendor. YEM was responsible to provide service of changing out the old…
Various upgrade and improvement projects that include design, procurement and construction of slurry pipeline, water pipeline, valves, ventilation ducting pipe,…
This was a continuous maintenance contract for 12 months. YEM supplied a highly skilled workforce to undertake general maintenance for…
Ongoing maintenance contract. YEM has been providing comprehensive maintenance services for the Ball mill circuit on Sino site since end…