This project is to install new cable ladder along 2.2 kilometres of overland conveyor.This is to facilitate the removal of the existing cable ladder to enable the free access of the conveyor rollers New cable to be installed where appropriate and then transfer all the existing circuits onto the new ladder.Where practicable the new cables are laid during normal production time.The circuits are transferred during times of planned shutdowns so as not to impede on production