EPC project for upgrading existing major hoppers with a new type of lining system. YEM was responsible for the engineering, design, procurement and installation of the new liners. The new design of metal backed rubber plates which are manageable by man-handling. This upgrade has improved the reliability and maintainability of the lining system resulting in less downtime and higher production rates.